[flickr]photo:4369849774[/flickr]
Sidewalk conditions on the Torrence Avenue bridge. The bridge is apparently slated to be replaced. Photo by Eric Rogers.
On Monday, Illinois Secretary of Transportation Ann Schneider announced the state’s multi-year multi-modal transportation plan and a list of all projects it intends to build. I looked through the District 1 list and picked out 29 projects to happen (or start) in Chicago from now until 2015.
My list is here which includes 1 pedestrian, 2 rail, 6 transit, and 20 road projects. The Illinois Department of Transportation (IDOT) website lists all projects in the plan. Note that rail and transit projects are listed separately from road (and pedestrian overpass) projects.
Read through my handpicked list of projects and leave a comment telling me the project(s) about which you want to learn more. A sampling of the projects in the list:
- Bridge replacement at Torrence Avenue at the Calumet River. This bridge is part of a recommended bike route and connects to the Burnham Greenway via 126th Street. It should be made bike friendly. The bridge deck is made of concrete, but the lanes are too narrow for comfortable cycling and the sidewalks are a mess.
- 31st Street bridge replacement over Metra Electric tracks. The beach and playground here are popular destinations, and many people access the Lakefront Trail here. The bridge has two big bumps at the disintegrating joints at both ends of the bridge. CDOT has proposed protected bike lanes for this street segment, part of Wells Street to Lakefront Trail.
- Resurfacing Noble Street from Augusta Boulevard to Erie Street. I’d like to recommend a change in this project: extend it north to Milwaukee Avenue, turn the segment from Milwaukee to Augusta into a two-way for bicycling (many people already ride against traffic here because it provides convenient access to Augusta Boulevard and Chicago Avenue, two blocks south), and make the street a bike boulevard. This street is very wide, yet has low traffic. The street should be modified to ensure appropriate traffic speeds.
- Resurfacing Canal Street from Roosevelt Road to Cermak Road. This is a great opportunity to fix a gap in the bikeway network. A bike lane currently exists from 14th Street to approximately 17th Street, prematurely ending before the 18th Street cycle track. The road has a width compatible with a good diet plan, reducing the number of non-bike lanes and created a protected bike lane. The street is no longer used for Maxwell Street Market and can finally receive the quality bike lane due to it.
I excluded some projects because they are already under construction, like Fullerton Parkway at the Lincoln Park lagoon.