Bike lanes update: Franklin Boulevard under construction, Wells Street soon

[flickr]photo:7213335286[/flickr]

Bikeway construction in 2012 continues at a breakneck pace. Crews were installing a buffered bike lane on Franklin Boulevard on Wednesday, between Central Park Avenue/Conservatory Drive and Sacramento Boulevard (0.75 miles) in East Garfield Park. The safety project eliminates a travel lane in each direction, creates a center left turn lane, and refreshes crosswalk markings. Adding a concrete barrier or parked cars could make it a protected bike lane. Read John’s earlier article about bikeways in this neighborhood, Are the upcoming Streets for Cycling projects in good locations?.

The abysmal pavement condition in the bike lane should have been repaired before bike lane markings were striped. The Franklin Boulevard buffered bike lane connects to a conventional bike lane on Central Park Avenue/Conservatory Drive (which connects to a bikeway on Lake Street coming soon). Sacramento Boulevard doesn’t have a bikeway.

[flickr]photo:7213279344[/flickr]

[flickr]photo:7213314128[/flickr]

CDOT should address this unsettling missing sewer cover and other deep potholes and pavement cracks in the bike lane. See all 18 photos. Continue reading Bike lanes update: Franklin Boulevard under construction, Wells Street soon

Design and features of six Bloomingdale Trail access parks are formulated in a single night

[flickr]photo:7210786620[/flickr]

Participants at Tuesday evening’s access parks charrette. Most photos by John. 

In 2015, when the Bloomingdale Trail and parks are complete, no one should be able to say that a feature or two isn’t supposed to be there. In a public planning process that continues to impress, with unprecedented, widespread community involvement, a new step was completed on Monday and Tuesday with the release of the framework plan and a trail access and park charrette, respectively. The residents of Chicago have designed this trail and its accompanying access parks by providing feedback probably totaling several million words. This is a process where votes are cast by showing up and participating; homeowners concerned about privacy met directly with members of the design team, and meeting participants stressing their concerns over people bicycling too fast were among the voters.

The design team, which consists of the Chicago Department of Transportation (CDOT), Trust for Public Land (TPL), the Friends of the Bloomingdale Trail, and TPL and the Park District’s many contractors, held an access park charrette on Tuesday, May 15, 2012, at the Humboldt Park Fieldhouse. Continue reading Design and features of six Bloomingdale Trail access parks are formulated in a single night

Photos from day 2 of Elston Avenue cycle track construction

[flickr]photo:7205825818[/flickr]

The northbound section reached Division Street. 

The design reveals itself hour by hour (see day one). Today I visited at 10 AM. One Twitterer had this reaction to the project: “@gabe_klein As a daily Elston bike commuter I thank you and all of @ChicagoDOT for expanding these facilities. cc @gridchicago @thetrolusk”.  Continue reading Photos from day 2 of Elston Avenue cycle track construction

Comment of the day: Even though city may be divided, it’s time to embrace good changes

[flickr]photo:7192559904[/flickr]

Photo of a man riding a bike by Drew Baker, found in the Grid Chicago Flickr group

I prefer to see comments like this in my inbox. This comment was posted by “flashabc” on John’s article, Bike facilities don’t have to be the white lanes of gentrification, regarding new bike lanes on Division Street in Humboldt Park:

I ride my bike everywhere in the city from Logan thru Wicker and Into Pilsen. I document the murals and have painted a few myself. I am Puerto Rican that was born in Humboldt and raised in Logan. It is time for the “My Community” to embrace the changes and the good that comes with generation that is growing in and around Humboldt. This city was very divided as i grew up in these neighborhoods. Its just the way it is. But know for the first time in my 45 years i can ride a bike in the middle of the night on Milwaukee Ave. This is only because of the bike movement of the past few years. People working together is the only way this city will ever go foward. It is time for the Humboldt Park community to grow with the rest of the communities around it and not fall into the old fashion hate that has encircled it.

Thank you for your comment.

Recap: New bike lanes and NATO closures, plus upcoming Bloomingdale Trail and bike plan meetings

[flickr]photo:7179247236[/flickr]

A view down the North Side Main Line ‘L’ tracks by Drew Baker. 

This is a recap of the 12 articles posted in the last 5 days, as well as a look at the calendar ahead.

Wednesday, May 9, 2012

Thursday, May 10

Friday, May 11

Saturday, May 12

Sunday, May 13

Monday, May 14

Calendar

Tonight is a meeting about Bloomingdale Trail access parks and is the first meeting following yesterday’s release of the Framework Plan. “We are particularly interested in your feedback about access parks. After a short presentation, we’ll break into small groups to discuss the following access parks, and how ramps and other amenities will be designed.”

Tuesday, May 15, 2012
6 to 8 PM
Humboldt Park Fieldhouse, 1440 N Humboldt Drive, Chicago, IL

Wednesday night is the Ride of Silence to “honor fallen cyclists and raise awareness in this annual procession past Chicago Ghost Bikes”.

Wednesday, May 16, 2012
6 to 8 PM
Gather at 6 PM, Depart at 7 PM
Eternal Flame in Daley Plaza

Next Tuesday is the public revealing of the draft network of the Streets for Cycling Plan 2020. There are three more meetings and two webinars.

Tuesday, May 22, 2012
4 to PM
Copernicus Center, 5216 W. Lawrence Ave, Chicago, IL
Presentation with Q&A at 1630 and 1830.

Elston Avenue bike lane returns in upgraded form

[flickr]photo:7198633778[/flickr]

Riding in the cycle track southbound towards the Magnolia Avenue “Y”. 

[flickr]photo:7198625354[/flickr]

Riding in the cycle track southbound next to Elston Materials’s property. The parking space and wide area in this photo are for a tanker truck as seen in this photo

After seven months without them because of neighbor and weather delays, pavement markings make their return today to Elston Avenue between North Avenue and Magnolia Avenue. The difference now is that buffered bike lanes and a cycle track replace last year’s conventional bike lane. The full project limits are North Avenue to Milwaukee Avenue, a distance of 1 mile. The enhanced bikeway should definitely bring cyclists back to Elston Avenue, after what I perceived was a period of avoidance. A cycle track at the “Y” intersection of Elston and Magnolia Avenues should reduce the incidence of high-speed, northbound passes.

At 12:42 PM today, only sections between North Avenue and Magnolia Avenue had been striped.  Continue reading Elston Avenue bike lane returns in upgraded form