[flickr]photo:7213335286[/flickr]
Bikeway construction in 2012 continues at a breakneck pace. Crews were installing a buffered bike lane on Franklin Boulevard on Wednesday, between Central Park Avenue/Conservatory Drive and Sacramento Boulevard (0.75 miles) in East Garfield Park. The safety project eliminates a travel lane in each direction, creates a center left turn lane, and refreshes crosswalk markings. Adding a concrete barrier or parked cars could make it a protected bike lane. Read John’s earlier article about bikeways in this neighborhood, Are the upcoming Streets for Cycling projects in good locations?.
The abysmal pavement condition in the bike lane should have been repaired before bike lane markings were striped. The Franklin Boulevard buffered bike lane connects to a conventional bike lane on Central Park Avenue/Conservatory Drive (which connects to a bikeway on Lake Street coming soon). Sacramento Boulevard doesn’t have a bikeway.
[flickr]photo:7213279344[/flickr]
[flickr]photo:7213314128[/flickr]
CDOT should address this unsettling missing sewer cover and other deep potholes and pavement cracks in the bike lane. See all 18 photos. Continue reading Bike lanes update: Franklin Boulevard under construction, Wells Street soon