[flickr]photo:8167489753[/flickr]
A variable message sign on Wells Street at Hubbard directs traffic to LaSalle Street. There was no sign directing bicyclists, which is odd because this route on June 26, 2012, saw 679 riders from 7-9 AM at Chicago Avenue.
The Wells Street bridge closed on Monday, November 5, to all traffic (the sidewalks were open in the morning) so that the bridge can be rebuilt; a new concrete deck will be constructed providing a safer surface for bicycling. The Chicago Department of Transportation estimates construction will finish by December 1, 2013. To reroute traffic, CDOT posted a map and plan showing different detour routes for different transportation modes: one each for pedestrians, bicyclists, drivers, and bus operators.
Information on the street, however, doesn’t match the plan. People on bikes are directed by the map to turn left from Wells Street onto Kinzie Street and then use Clark Street to cross the river. Yet a variable message sign on Wells Street directs Wells Street traffic to use Illinois Street. One Grid Chicago reader told us that changing lanes on his bicycle, during morning rush hour, from the bike lane on Wells Street to make a left onto Kinzie Street was difficult because many drivers were not turning left onto Illinois Street; in the subsequent days he took Clark Street from the north but found traffic to be worse. Continue reading Business as usual: Wells Street bridge closure detour falls short of “8 to 80” bike planning